Boilers Made In China


Boilers Made In China

Boilers Made In China
  • Offshore price : $8,999.00 - $100,000.00
  • Minimum order quantity : 1 set
  • Supply Capacity : 10 units/month
  • Manufacturer/Brand : TOBO BOILER
  • Port : Anyang
  • payment terms : Letter of Credit, Wire Transfer, VISA

Leave us a message

We will send out plans and quotations within five minutes

Name (optional)

Email

Whatsapp

Choose product type

Message

  • Development of Precise Source Location and Leak Monitoring

    main boiler tube (Super Heater, Reheater, Economizer, Waterwall) of 500MW class thermal power plant. Acoustic Emission Testing method, one of the Non-Destructive Testing method was applied to detect the low-and high-frequency leakage signal for boiler structure. To do this, this study apply complex sensor for vibration and acousticGet Price

  • STUDY OF VARIOUS SYSTEMS IN 500MW THERMAL …

    May 07, 2015 · Page 34 REHEATER: Type : Front pendant platen Rear pendant spaced Total H.S Area m2 : 6298 Control : Burner tilt and Excess air ECONOMIZER: Type : Plain tube Total H.S Area m2 : 19050 No. of blocks : 2 AIR HEATER: Type : Tri-sector 31.5 VIT 2000 Total H.S area m2 : 86000 No's : 2 Motor KW : 18.5 BOILER AUXILIARIES SPECIFICATIONS: Fans Type No's Flow …Get Price

  • Steam turbines start-ups

    the latter two cases, depending on the boiler characteristics, steam temperature can be lower or higher than the casing temperature. Since cold starts usually take place after long standstills, hence in such cases inspection of turbine and equipment according to their instructions is necessary. 1.1.1 Steam parameters required for cold startGet Price

  • Mitsubishi Hitachi Power Systems Ltd. Boiler Business and

    Our boiler products later on include Unit 2 of the Matsuura Thermal Power Station of J-POWER with an increased main steam temperature of 593°C (1,000 MW, 24.1 MPag and 593/593°C) in 1997, Unit 1 of the Misumi Thermal Power Station of Figure 4 gives the exterior view and major specifications of Paiton III, which is Indonesia's first SC Get Price

  • Vivek Vasava Kurup - Production and Planning Coordinator

    • Steam Path Auditing of Steam Turbines (500MW, 210MW, 110MW etc) using the eSTPE 7.2. • Residual Life Assessment of Power Plant Components (Boiler, Turbines & Pipings etc) using NDT and Microstructural Analysis. • Provide inputs to project managers on project budgeting, scheduling and resourcing.Get Price

  • Study of Equipment Prices in the Power Sector

    Coal-Fired Boilers 87 Steam Turbines 90 Combustion Turbines 92 Stationary Diesel Engine Turbines 92 Annex 4. OEMs in India 95 List of Technical Reports 97 Figures 2.1: Average Price of Crude Oil Worldwide 4 2.2: Effect of Size on Cost of Gas Turbine Combined Cycle Units 10 2.3: Effect of Size on Cost of Pulverized Coal-Fired Plants 11Get Price

  • Feasibility Study of the CCS Deployment to Australia by

    Specifications of water treatment system depends on usage of water. 18 500MW Oxyfuel Power Plant ASU Boiler CPU CO 2 Flue Gas Treatment Air 345MWO 2 Non-condensable Gas H 2 O N 2Revenue Coal Fertilizer Chemical Reuse Turbine Generator (around 500MAUD for 500MW)Get Price

  • Kyoowan(Pablo) Kim - 대한민국 | 프로필 | LinkedIn

    Responsible engineer for waste heat recovery boiler, fired heater, packaged boiler and cooling tower. Prepared equipment specifications and evaluated technical bid documents. Interfaced with the Purchasing Department throughout the vendor negotiation process. Coordinated in-house group, client, and vendors.Get Price

  • August 2009 Volume No.7 STORM TECHNOLOGIES, INC.

    A 500MW boiler may have over 500 individual tube circuits for each of the superheater and the reheater. So, equipping at least one of five of the individual circuits with thermocouples (say 100-150 out of 500) is a good idea. Tube metal thermocouples are typically installed in accordance with Figures 2 and 3 in the boiler penthouse.Get Price

  • Standard erection manual (pressure parts)

    these two components, a full boiler system can be erected in as little as 30 hours. Significant revenue savings with less down-time and lower fixed costs Lightweight - weighs as little as one fifth of an equivalent steel system Fast erection - a 500MW boiler installation can be completed in 30 hours Simple Installation with no welding or tools requiredGet Price

  • Heramb Govilkar - Sr. Design Engineer - Fluor Ltd | LinkedIn

    Proposal work for SCR retrofitting for 500MW coal/ Biomass fired boilers- Power plants. Consutant Mechanical / Process engineer for Package boiler for Refinery. Package equipment engineer for procuring and installing Waste heat boiler after FCCU unit and procuring and installing of Marine loading arm for crude oil.Get Price

  • Typical 500 MW Coal Fired Plant - Storm Technologies, Inc

    Boiler FD Fans Mills Most of the large units have been retrofitted with SR's, scrubbers and upgraded electrostatic precipitators and/or bag houses. The focus of billions of dollars in investment has been applied to the back ends of the coal fleet - very responsible and the right things to do for clean coal plants. Get Price

  • Muhammad Sulaiman Jaffery - General Manager Projects

    During the internship, I learned complete technical specifications of product spectrum of Siemens that includes Simatic PLCs, HMIs, Simatic Software, Field Instrumentations, Offer and proposal making and Handling compliance documents. Also assisted Sr. Automation Engineer on projects like DESCON OXYCEM BOILER AUTOMATION.Get Price

  • August 2009 Volume No.7 STORM TECHNOLOGIES, INC.

    In 1968, we manufactured and installed our first supercritical (SC) oil-fired boiler at Unit 3 of the Chita Thermal Power Station of Chubu Electric Power Co., Inc. (500 MW, 24.1 MPag and 538/538°C) and thereafter, changing the applicable fuel from oil to gas and eventually to coal.Get Price

  • August 2009 Volume No.7 STORM TECHNOLOGIES, INC.

    A 500MW boiler may have over 500 individual tube circuits for each of the superheater and the reheater. So, equipping at least one of five of the individual circuits with thermocouples (say 100-150 out of 500) is a good idea. Tube metal thermocouples are typically installed in accordance with Figures 2 and 3 in the boiler penthouse.Get Price

  • Mitsubishi Hitachi Power Systems Ltd. Boiler Business and

    Our boiler products later on include Unit 2 of the Matsuura Thermal Power Station of J-POWER with an increased main steam temperature of 593°C (1,000 MW, 24.1 MPag and 593/593°C) in 1997, Unit 1 of the Misumi Thermal Power Station of Figure 4 gives the exterior view and major specifications of Paiton III, which is Indonesia's first SC Get Price

  • Mitsubishi Hitachi Power Systems Ltd. Boiler Business and

    Mitsubishi Hitachi Power Systems Ltd. Boiler Business and Get Price

  • Study of Equipment Prices in the Power Sector

    Coal-Fired Boilers 87 Steam Turbines 90 Combustion Turbines 92 Stationary Diesel Engine Turbines 92 Annex 4. OEMs in India 95 List of Technical Reports 97 Figures 2.1: Average Price of Crude Oil Worldwide 4 2.2: Effect of Size on Cost of Gas Turbine Combined Cycle Units 10 2.3: Effect of Size on Cost of Pulverized Coal-Fired Plants 11Get Price

  • Automated Boiler Wall Cleaning & Inspection

    boilers. Especially on the hot areas of the boiler water wall this frequently leads to unscheduled downtime or even forced outages. To avoid steam boiler failures the maintenance recommendations today comprise of cleaning and inspection by means of Non Destructive Testing. Cleaning is usually done using conventional sand-blasting systems.Get Price

  • 500 mw boiler specification

    Construction of 500 MW Steam Boiler - slideshare.net. Jan 15, 2014· Construction of 500 mw boiler by Vaibhav G. Paydelwar ( Project Engineer) Sunil Hi-Tech Engineers Limited 2. WHAT DO YOU MEAN BY BOILER ? Boiler means any closed vessel exceeding 22.75 Ltr. in capacity used for steam generation under pressure.Get Price

  • WILLEM BRIEL - High School Frikkie Meyer, Thabazimbi

    - Construction and commissioning 2 x 500MW GE Steam Turbines, 2 x 500MW Ishikawajima-Harima Heavy Industry Coal Fired Coal Fired Boilers and all auxiliary plant Operations and Maintenance Manager - 2 Years, reduce plant trips and shut downs by planning and training of Locals - Improve plant reliability through intensive training of LocalsGet Price

  • 100 mw thermal power plant boiler and other specifications

    Mitsubishi Hitachi Power Systems Ltd. Boiler Business and Get Price

  • 3.igen Ea Boiler | Boiler | Coal

    Boiler efficiency Past performance trends on boiler loading$ operation$ P>F$ efficiency -aGor constraints in ac!ieving t!e !ig! P>F$ load or efficiency B&nput from plant personnelC -aGor renovation and modifications carried out in t!e recent past Coal # quality and calorific values aspects 'perational failures leading to in efficient operation Get Price

  • STANDARD TECHNICAL SPECIFICATION FOR MAIN PLANT …

    Standard Technical Specification for Sub- critical Thermal Power Project - 2x(500MW or above) Main Plant Package iv Clause No. Description Page No. 3.11 Boiler Feed Pumps 3- 50 3.11.1 Sizing criteria 3- 50 3.11.2 Design aspects 3- 51 3.11.3 Other requirements 3- 55 3.11.4 Mechanical seals 3- 56 3.11.5 Gear boxes 3- 57Get Price

  • Welcome to Boiler Controls Private Limited__________R&M

    Design of INSTRUMENTATION & CONTROL for Power Boiler/Furnace, HRSG/FBC Boilers. Erection and Commissioning of SCANNER, HEA IGNITOR, OIL GUN, COOLING AIR FAN SYSTEM. Supervision of Erection and Commissioning of complete C&I packages for Boiler/Furnace. "PRODUCT CATALOGUE SHALL BE SUBMITTED ON REQUEST." [email protected] Get Price

  • Bosch Thermotechnology Commercial & Industrial | Home

    Heating boilers Heat highly efficiently and save CO2 emissions at the same time. Optimize your energy costs with innovative heating boilers from Bosch. Info on heating boilers . VRF systems Bosch VRF systems for efficient air conditioning: Wide capacity range of up to 270 kW in one centralised system. Modular and space-saving.Get Price

  • Feasibility Study of the CCS Deployment to Australia by

    Specifications of water treatment system depends on usage of water. 18 500MW Oxyfuel Power Plant ASU Boiler CPU CO 2 Flue Gas Treatment Air 345MWO 2 Non-condensable Gas H 2 O N 2Revenue Coal Fertilizer Chemical Reuse Turbine Generator (around 500MAUD for 500MW)Get Price

  • The complete guide to Access Tower Systems

    four 500MW boiler units at Ratcliffe with selective catalytic reduction (SCR) technology to reduce NOx emissions. The contract required the duration of the four tie-in outages to decrease over time. Achievements: Substantial phases of the project were completed ahead of schedule, with the project due to fully complete in 2014.Get Price

  • The complete guide to Access Tower Systems

    these two components, a full boiler system can be erected in as little as 30 hours. Significant revenue savings with less down-time and lower fixed costs Lightweight - weighs as little as one fifth of an equivalent steel system Fast erection - a 500MW boiler installation can be completed in 30 hours Simple Installation with no welding or tools Get Price

  • boiler specifications for 10mw – Industrial Boiler Supplier

    A typical utility boiler furnace for a 500-600MW boiler will be about 56ft wide and about 50ft deep. There will be about 48 burners located in the burner belt and often, tube metal thermocouples are installed on the terminal superheater and reheater tubes to provide operator feedback on the actualGet Price

  • Final Thermal Power Plant Cover - Bureau of Energy Efficiency

    Table 5: Boiler Details (Process and Co-Generation) 122 Table 6: Electricity from Grid/Others, Renewable Purchase Obligation, Notified Figures124 Table 7: Own generation through Captive Power Plants 126 Table 8: Solid Fuel Consumption 130 Table 9: Liquid Fuel Consumption 133 Table 10: Gaseous Fuel Consumption 136Get Price

Hey, let me help you!